5 edition of Economic evaluation of advanced limestone, Davy S-H, and Dowa gypsum-producing FGD processes found in the catalog.

Economic evaluation of advanced limestone, Davy S-H, and Dowa gypsum-producing FGD processes

du 7 frimaire, an quatrieme de la Re publique franc ʹaise, une et indivisible

  • 735 Want to read
  • 932 Currently reading

Published by Administrator in U.S. Environmental Protection Agency, Air and Energy Engineering Research Laboratory

    Places:
  • United States
    • Subjects:
    • U.S. Environmental Protection Agency, Air and Energy Engineering Research Laboratory


      • Download Economic evaluation of advanced limestone, Davy S-H, and Dowa gypsum-producing FGD processes Book Epub or Pdf Free, Economic evaluation of advanced limestone, Davy S-H, and Dowa gypsum-producing FGD processes, Online Books Download Economic evaluation of advanced limestone, Davy S-H, and Dowa gypsum-producing FGD processes Free, Book Free Reading Economic evaluation of advanced limestone, Davy S-H, and Dowa gypsum-producing FGD processes Online, You are free and without need to spend extra money (PDF, epub) format You can Download this book here. Click on the download link below to get Economic evaluation of advanced limestone, Davy S-H, and Dowa gypsum-producing FGD processes book in PDF or epub free.

      • Caption titleAt head of title: Project summaryDistributed to depository libraries in microficheMar. 1985.EPA-600/S7-84-025.

        StatementU.S. Environmental Protection Agency, Air and Energy Engineering Research Laboratory
        PublishersU.S. Environmental Protection Agency, Air and Energy Engineering Research Laboratory
        Classifications
        LC Classifications1985
        The Physical Object
        Paginationxvi, 51 p. :
        Number of Pages60
        ID Numbers
        ISBN 10nodata
        Series
        1nodata
        2
        3

        nodata File Size: 2MB.


Share this book
You might also like

Economic evaluation of advanced limestone, Davy S-H, and Dowa gypsum-producing FGD processes by U.S. Environmental Protection Agency, Air and Energy Engineering Research Laboratory Download PDF EPUB FB2


For a 500-MW power unit burning 3. According to a recent report by the EPA, flue gas desulfurization processes using lime require lower capital investments than limestone processes, and at low coal sulfur contents, annual revenue requirements are also lower.

Economic evaluation of advanced limestone, Davy S

Using additives in the limestone processes reduces both capital investment and annual revenue requirements. Landfill waste disposal is a minor cost element in all three processes.

D Maxwell Book 1 edition published in 1978 in English and held by 1 WorldCat member library worldwide This report is a state-of-the-art review of processes being studied in the U.

The capital investment for the base-case limestone scrubbing process 500 MW, 3.

Economic evaluation of advanced limestone, Davy S

As key features, the model provides estimates of capital investment and operating revenue requirements. Distributed to depository libraries in microfiche• The forced-oxidation landfill disposal option has a lower capital investment than the unoxidized pond disposal option for all cases studied; however, the first-year and levelized annual revenue requirements are slightly higher for the forced-oxidation landfill process for most coal applications. : Tennessee Valley Authority, Muscle Shoals, AL USA.

The use of adipic acid remains economically attractive even if both a high unit cost and a high degradation factor for adipic acid are assumed. The forced-oxidation landfill disposal option has a lower capital investment than the unoxidized pond disposal option for all cases studied; however, the first-year and levelized annual revenue requirements are slightly higher for the forced-oxidation landfill process for most coal applications.

In conjunction with the US Enviromental Protection Agency sponsored Shawnee test program, Bechtel National, Inc. Costs for the equivalent limestone scrubbing process using a Turbulent Contact Absorber TCA are lower while those for the venturi - spray tower absorber are higher.

176 references, 35 figures, 56 tables. It also provides a material balance, equipment list, and a breakdown of costs by processing areas. Changes in power unit size and coal sulfur content and Dowa gypsum-producing FGD processes the costs of all three processes similarly.